South Pars Gas Development Field Phase 19

South Pars Phase 19 SSU
South Pars Phase 19 Sulphur Solidification Unit (3D model)

POGC assigned development of Phase 19 of South Pars Gas Field to a consortium comprised of Petropars and the Iranian Offshore Engineering & Construction Company (IOEC), and Petropars Iran (PPI) as an EPC contractor. The onshore facilities are located in Tombak (situated approximately 250km South East of Boushehr Port) at South Pars Site 2 and the offshore facilities and wells are located 120km from the Persian Gulf coast. Offshore facilities of this project is included 21 wells, 4 platforms, Two 32" pipes to transfer gas from the main platforms to the onshore processing unit, totaling 260km together with two 4.5" pipelines for MEG injection and Two 18" cladded pipelines to transfer gas from the satellite platforms to the main platforms inlet, totaling 12km.The final production of Onshore processing units are 50 MSCMPD of refined gas, 1.1 MT per year of liquefied gas, 77 thousand barrels per day of gas condensates, 1 MT per year of Ethane gas and 400 MT per day Granulated Sulphur.

Sulphur Solidification Unit

Capacity 1,440 Ton per Day
Method Granulation
Client Petropars
Delivery Date 2013
Status Under construction
Location Assaluyeh - Iran
Feed Liquid Sulphur from SRU Plant
Product Granulation (spherical shape)
Number of trains 2
Train capacity 30 Ton per hour / 720 Ton per day
Storage 2 X 1,100 Ton = 2,200 Ton Silo
Handling Rubber Belt conveyor and Bucket Elevator
Equipment
  • Granulator Drum
  • Cyclone Filter
  • Sulphur Buffer Tank
  • Liquid Sulphur Filter and Pump Group
  • Liquid Sulphur Transfer Pump group
  • Granulated Sulphur Conveyors
  • Granulated Sulphur Elevator
  • Granulated Sulphur Screeners
  • Bulk Sulphur Re-melter
  • Storage Silos
  • Telescopic Unloader
  • PLC controlling system and Instrument
  • Electrical VFD and Switchgears